With the support of SEZ (Stiftung für Entwicklungszusammenarbeit Baden Württemberg), Aktion Hoffnung and several individual donors, more than 50 wells have been built since 2005. The local management is in the hands of hydraulic engineer John (Caritas Masaka). The first step of a well construction is the search for a suitable site. Immediately after that, a committee is formed from the target group that will get water from the well, which must include at least 2 children, because they will later be responsible for carrying the water. As many people as possible from the community have to help with the construction of the well, so that the identification with it is ensured. John takes great care that every step is followed by the people. It should be entirely their well. Video Brunnen